通钢公司炼钢事业部老维修间到半成品库道路维修
项目采购公告
点击登录查看拟招标采购炼钢事业部老维修间到半成品库道路维修项目,欢迎符合资格要求、具备承揽能力、诚实守信的企业参与。
1、项目内容:
序号 | 项目名称 | 项目主要内容 | 备注 |
1 | 老维修间到半成品库道路维修 | 道路:8m长,12m宽一处、41m长,12m宽一处、744m长,8m宽一处、13m长,12m宽一处、70m长,16m宽一处、18m长,19m宽一处、30m长,2m宽一处、60m长,10m宽一处。 1、挖掘机挖渣石并挖掘机装车,自卸汽车外运10km (8m*12m+41m*12m+744m*8m +13m*12m+70m*16m+18m*19m+30m*2m+60m*10m)*1.5m(深)=13227m3 2、地基基层碾压 8m*12m+41m*12m+744m*8m+13m*12m+70m*16m+18m*19m+30m*2m+60m*10m=8818m2 3、毛石灌浆垫层(M7.5#混合砂浆,从搅拌站自购) (8m*12m+41m*12m+744m*8m+ 13m*12m+70m*16m+18m*19m+30m*2m+60m*10m)*0.9m(深)=7936.2m3 4、毛石灌浆垫层机械平整碾压8818m2 5、碎石灌浆垫层(M7.5#混合砂浆,从搅拌站自购) (8m*12m+41m*12m+744m*8m+ 13m*12m+70m*16m+18m*19m+30m*2m+60m*10m)*0.2m(深)=1763.6m3 6、碎石灌浆垫层机械平整碾压8818m2 7、现浇C30钢砼(商品砼)地面 (8m*12m+41m*12m+744m*8m+13m*12m+70m*16m+ 18m*19m+30m*2m+60m*10m)*0.4m(深)=3527.2m3 钢筋制作,安装Φ20mm 双层双向钢筋 间距@200,马凳子1.7m长/个,4个马登子/m2 {[8m*(12m/0.2m+1)+(12m+0.8m)*(8m/0.2m+1)+(41m+0.8m*5)*(12m/0.2m+1)+(12m+ 0.8m)*(41m/0.2m+1)+(744m+0.8m*83)*(8m/0.2m+1)+8m*(744m/0.2m+1)+(13m+0.8m)*(12m/0.2m+1)+(12m+0.8m)*(13m/0.2m+1)+(70m++0.8m*8)*(16m/0.2m+1)+(16m+ 0.8m)*(70m/0.2m+1)+(18m+0.8m)*(19m/0.2m+1)+(19m+0.8m)*(18m/0.2m+1)+(30m+ 0.8m*4)*(2m/0.2m+1)+2m*(30m/0.2m+1)+(60m+0.8m*7)*(10m/0.2m+1)+10m*(60m/0.2m+1)]*2+1.7m*35272}*0.00247t/m=611.43t 8、道路两侧模板制作 槽钢[20#a 50m(长)*2(面)*2(段)*0.02263t/m=4.53t 9、道路两侧钢模板安装,拆除槽钢[20#a (8m+41m+744m+13m+70m+18m+60m)*2*2*0.02263t/m=86.36t 10、锯缝机切伸缩缝(8m+41m+744m+13m+60m)*2(道)+(70m+18m)(长)*3(道)+12m(长)*13(道)+8m(长)*150(道)+16m(长)*14(道)+ 19m(长)*4(道)+10m(长)*12(道)=3772m 11、路边石:道岔口9m长 ①、人工挖沟(三类土) (954m-9m)(长)*2(道)*0.5m(宽)*0.4m(深)=378m3 ②、花岗岩路边石拆除,利旧重新砌路边石 (954m-9m)*2=1890m ③、土方人工回填并夯实 (954m-9m)*2*(0.5m*0.4m-0.15m*0.3m)=292.95m3 ④、余土人工运距10m,人工装车,自卸汽车外运10km工程量①-③项=85.05m3 12、道路雨排水:排水管DN300,10m长/个,48个 ①、钢雨篦子拆除,重新安装48个,用人工16个。 ②、人工挖沟槽及坑(三类土)(10m(长)*1m(宽)*1.5m(深)+1.8m(长)*1.2m(宽)*0.8m(深))*48(个)=802.94m3 ③、现浇C15砼垫层1.2m*0.9m*0.1m*48=5.18m3 ④、现浇C30砼(商品砼)雨篦子井 井底1m(长)*0.8m(宽)*0.15m(深)*48(个)=5.76m3 井壁(1m+0.8m*2)*0.15m*0.4m*48=7.49m3 井盖 1m*0.8m*0.15m*48=5.76m3 ⑤、土方人工回填并夯实 2项-3项-3.14*0.152m*480m-1m*0.8m*0.7m*48=736.97m3 ⑥、余土人工运距10m,人工装车,自卸汽车外运10km,工程量②-⑤项=65.97m3 ⑦、机械凿红砖下水井孔,拆除物人工装车,自卸汽车外运10km 3.14*0.32m2*0.24m*48=3.26m3 ⑧、用M7.5#水泥砂浆红砖堵孔 3.14*(0.32m-0.152m2)*0.24m*48=2.44m3 ⑨、用1:2水泥砂浆井壁双面抹灰 1.2m2*48=57.6m2 ⑩、原有下水井内人工挖淤泥,人工垂直运距3m,人工装车,自卸汽车外运10km 2.5m3*48=120m3 ⑾、搭设三角起重架 48座 ⑿、下水井井盖拆除,安装用人工4个。 ⒀、钢管道安装,动力除锈,刷红丹防锈漆两遍,缠三层玻璃丝布刷四遍沥青漆 DN300mm 480m ⒁、四块瓦钢管弯头制作,安装 DN300mm 48个 33.33kg/个*48个=1599.84kg 13、下水井 ①、机械拆除红砖下水井4个16.16m3 ②、机械拆除下水井砼垫层 3.14*1.342m2*0.1m*4=2.26m3 ③、拆除物人工装车,自卸汽车外运10km工程量①+②项=18.42m3 ④、人工挖三类土,人工回填并夯实 [3.14*1.642m2*3.6m-3.14*3.5m*(1.122m+0.4122m2+1.12m*0.412m)/3]*4=93.98m3 ⑤、用M7.5#水泥砂浆砌红砖下水井 3.14*3.5m*(1.12m+0.412m)*0.24m*4=16.16m3 ⑥、用1:2水泥砂浆红砖下水井外抹灰3.14*3.5m*(1.12m+0.412m)*4=67.35m2 ⑦、用 1:2水泥砂浆井圈周边找平层δ=80mm 1.8m2*4=7.2m2 ⑧、下水井直爬梯拆除,制作,安装Φ20 1m*14*0.00247t/m*4=0.14t ⑨、钢井圈,盖拆除,安装4个,用人工1个。 14、27号门等零星修补:9m长,6m宽一处、9m长,3.5m宽一处 ①、机械拆除钢砼地面,拆除物人工运距10m ,人工装车,自卸汽车外运10km (9m*6m+9m*3.5m)*0.4m(深)=34.2m3 ②、拆除钢砼剔除钢筋并运至指定地点:发生1.3m3液压挖掘机台班2个(用于砸碎砼块)氧气4瓶,乙炔2瓶,5t自卸汽车台班0.5个,用人工8个。 ③、挖掘机挖渣石,并挖掘机装车,自卸汽车外运10km 9m*6m*1.1m(深)=59.4m3 ④、地基基层碾压9m*6m=54m2 ⑤、毛石灌浆垫层(M7.5#混合砂浆,从搅拌站自购) 9m*6m*0.9m(深)=48.6m3 ⑥、毛石灌浆垫层机械平整碾压54m2 ⑦、碎石灌浆垫层(M7.5#混合砂浆,从搅拌站自购) 9m*6m*0.2m=10.8m3 ⑧、碎石灌浆垫层机械平整碾压54m2 ⑨、地面现浇C30钢砼(商品砼) (9m*6m+9m*3.5m)*0.4m=34.2m3 钢筋制作,安装Φ20mm 双层双向钢筋 间距@200,马凳子1.7m长/个,4个马登子/m2 ,{[ 9m*(6m/0.2m+1)+6m*(9m/0.2m+1)+9m*(3.5m/0.2m+1)+3.5m*(9m/0.2m+1)]*2 +1.7m*342}*0.00247t/m2=5.8t。 | 炼钢事业部 |
2、资格要求:
1)具有建筑工程施工总承包三级或以上;或建筑机电安装工程专业承包三级或以上;或机电工程施工总承包三级资质或以上;
2)具有一般纳税人资格,能独立承担民事责任;
3)具有良好的业绩,诚实守信;
4)在以往经营活动中无违法记录;
5)具有履行合同的能力。
3、报名:按要求提供营业执照、开户许可证、法定代表人及代理人身份证明、法人授权委托书、业绩等资质材料,审核通过后进行技术交流。
4、发售采购文件、截止投标及开标时间:另行通知
5、资金来源:企业自筹
6、技术、商务咨询:点击登录查看